Q-2, r. 34.1 - Regulation respecting municipal wastewater treatment works

Full text
12. The operator of municipal wastewater treatment works must send to the Minister electronically, not later than 42 days following the end of each month, a monthly report in which the flow rate, the results of the analysis of samples, pH measurements, results of toxicity tests, overflow measurements and observations made in the course of operation of the operator’s works are recorded.
O.C. 1305-2013, s. 12.